Client: City of Steamboat Springs
The City of Steamboat Springs commissioned DBC to design the new West Area One Million Gallon, Potable Water Storage Tank. Situated high on a hill overlooking the airport, our team designed the concrete tank underground to minimize visual impacts. DBC also designed over 5,000 feet of 16-inch water line to connect the storage to the airport and the City’s network. Our services included extensive network modeling to verify pressures and flow rates stayed within acceptable parameters. DBC provided daily construction inspection throughout the entire construction, which was a multi-year effort due to winter shutdowns. Completed in 2025.


