Client: Adams County
Completed in 2025, In conjunction with our roadway improvement plans for East 58h Avenue in Adams County, Colorado, DBC assessed the existing 10” asbestos cement water service conduit in the corridor and prepared construction plans for the removal, abatement, and construction of a new water main, tap, and meter to serve the Metro Water Recovery – Robert W. Hite Treatment Facility. The existing 10” asbestos cement service conduit was constructed in the 1960’s and it was replaced with new 10” ductile iron pipe and a new tap and meter installed to the point of connection with Denver Water.
Construction of the 10” service was integrated into the design of East 58th Avenue and was constructed in the City and County of Denver and in Adams County. DBC provided periodic construction inspection throughout the entire construction on an as needed basis, with specific tasks outlined below:
- Provided “On-Call” construction inspections and provided documentation for inspections (photos and field notes).
- Scheduled and observed utility testing, including leak detection, chlorination, bacteria, and pressure testing. Reviewed the results.
- Reviewed Requests for Information (RFI’s) and submittals from Contractors, made recommendations, and coordinated responses.